{"id":915,"date":"2023-11-12T18:34:42","date_gmt":"2023-11-12T15:34:42","guid":{"rendered":"https:\/\/myunusozkorkmaz.com.tr\/?p=915"},"modified":"2023-11-21T08:55:38","modified_gmt":"2023-11-21T05:55:38","slug":"formula-field-on-route-details-in-d365","status":"publish","type":"post","link":"https:\/\/myunusozkorkmaz.com.tr\/?p=915","title":{"rendered":"FORMULA FIELD ON ROUTE DETAILS IN D365"},"content":{"rendered":"\r\n<p>On this post, I am going to go over the &#8220;Formula&#8221; field within route functionality.<\/p>\r\n\r\n\r\n\r\n<p><strong><em>Note:<\/em><\/strong> <em>Master plan demonstration shown below is going to be originated from 400 meters of sales order quantity. Coverage group is &#8220;Requirement&#8221;. Sundays are closed for pick-up on the calenders assigned to machines. Resources have finite capacity and %100 efficiency. <strong>Operation number 20<\/strong> should be checked.<\/em><\/p>\r\n\r\n\r\n\r\n<p>There are 4 options on formula field:<\/p>\r\n\r\n<p><img decoding=\"async\" src=\"https:\/\/yunusozkorkmaz.files.wordpress.com\/2023\/11\/image-3.png?w=940\" alt=\"Bu g\u00f6rselin bo\u015f bir alt \u00f6zelli\u011fi var; dosya ismi: image-3.png\" \/><a href=\"https:\/\/yunusozkorkmaz.files.wordpress.com\/2023\/09\/image-1.png\"><img decoding=\"async\" class=\"wp-image-436\" src=\"https:\/\/yunusozkorkmaz.files.wordpress.com\/2023\/09\/image-1.png?w=971\" alt=\"\" \/><\/a><\/p>\r\n\r\n<p><strong><em>Note:<\/em><\/strong> The only purpose of these field values is to calculate the run time of the regarding operations. System does not utilize the capacity of resource based on &#8220;Formula&#8221; values. \u00a0<\/p>\r\n<p><strong>1- Standard:<\/strong> This is the default and mostly-used value. System calculates regarding operation&#8217;s process time as <strong>[(Run time) * (Hours\/Time) * (Order Quantity)] \/ (Process quantity)<\/strong>. For the example above: Process time = [(2,05) * (1) * (400)] \/ 1= 820 hours. Total time for the operation = 820 + 7 + 1 = 828 hours.<\/p>\r\n<p>&nbsp;<\/p>\r\n<p><a href=\"https:\/\/yunusozkorkmaz.files.wordpress.com\/2023\/11\/image-4.png\"><img decoding=\"async\" class=\"wp-image-458\" src=\"https:\/\/yunusozkorkmaz.files.wordpress.com\/2023\/11\/image-4.png?w=1023\" alt=\"\" \/><\/a> \u00a0<\/p>\r\n\r\n\r\n\r\n\r\n\r\n<p><strong>2- Capacity:<\/strong> System calculates regarding operation&#8217;s process time as<strong> [(Produced quantity \/ Resource capacity)]<\/strong> <strong>\/ Factor<\/strong>. System ignores Run time, Process quantity and Hours\/Time on routes. For the example above: Process time = [400 \/ 40]= 10 hours. Total time for the operation = 10 + 7 + 1 = 18 hours.<\/p>\r\n\r\n\r\n\r\n<p><strong><em>Note: <\/em><\/strong><em>Capacity unit on Resources form is only informative field. System does not use this value to convert to any unit of measure.<\/em><\/p>\r\n\r\n<figure class=\"wp-block-image size-large\"><a href=\"https:\/\/yunusozkorkmaz.files.wordpress.com\/2023\/11\/image-5.png\"><img decoding=\"async\" class=\"wp-image-459\" src=\"https:\/\/yunusozkorkmaz.files.wordpress.com\/2023\/11\/image-5.png?w=884\" alt=\"\" \/><\/a><\/figure>\r\n\r\n\r\n\r\n<figure class=\"wp-block-image size-large\"><a href=\"https:\/\/yunusozkorkmaz.files.wordpress.com\/2023\/11\/image-6.png\"><img decoding=\"async\" class=\"wp-image-460\" src=\"https:\/\/yunusozkorkmaz.files.wordpress.com\/2023\/11\/image-6.png?w=1023\" alt=\"\" \/><\/a><\/figure>\r\n\r\n<p>\u00a0 <strong>3- Batch:<\/strong> I know most of you wonder how it works :-). For &#8220;Batch&#8221; value, i prepared new example. Sales order quantity is 121 meters for the item (Inventory unit is also meters). Process time is calculated based on &#8220;Process quantity&#8221; under &#8220;Times&#8221; tab of Route details. System rounds the produced quantity up to multiply of process quantity. If production quantity is 61 meters, system rounds base quantity up to 2*60 = 120 meters and calculates process time as if the production quantity is 120 meters (batch quantity).<\/p>\r\n\r\n<figure class=\"wp-block-image size-large\"><a href=\"https:\/\/yunusozkorkmaz.files.wordpress.com\/2023\/11\/image.png\"><img decoding=\"async\" class=\"wp-image-451\" src=\"https:\/\/yunusozkorkmaz.files.wordpress.com\/2023\/11\/image.png?w=1014\" alt=\"\" \/><\/a><\/figure>\r\n\r\n<p>\u00a0 My sales order quantity is 121 meters and lets check the result: \u00a0<\/p>\r\n\r\n<figure class=\"wp-block-image size-large\"><a href=\"https:\/\/yunusozkorkmaz.files.wordpress.com\/2023\/11\/image-1.png\"><img decoding=\"async\" class=\"wp-image-453\" src=\"https:\/\/yunusozkorkmaz.files.wordpress.com\/2023\/11\/image-1.png?w=877\" alt=\"\" \/><\/a><\/figure>\r\n\r\n\r\n\r\n<p>System rounded production quantity (121 meters) up to 180 meters. Process time of production is: <strong>[(Run time) * (Hours\/Time) * (Batch quantity) \/ (Process quantity)<\/strong> <strong>= (3 * 1 * 180) \/ 60<\/strong> <strong>= 9 hours<\/strong>. Total time required for production is : 9 + 1 + 7 = 17 hours. \u00a0<\/p>\r\n\r\n<figure class=\"wp-block-image size-large\"><a href=\"https:\/\/yunusozkorkmaz.files.wordpress.com\/2023\/11\/image-2.png\"><img decoding=\"async\" class=\"wp-image-455\" src=\"https:\/\/yunusozkorkmaz.files.wordpress.com\/2023\/11\/image-2.png?w=1024\" alt=\"\" \/><\/a><\/figure>\r\n<p><strong>4- Resource batch:<\/strong> System calculates process time as <strong>[Order quantity \/ (Resource batch capacity \/ Factor)] * Run time<\/strong>. System ignores Process quantity on route. For the example above: Process time = [400 \/ (40\/1) ] * 2.05= 20.5 hours. Total time for the operation = 20.5 + 7 + 1 = 28.5 hours. \u00a0<\/p>\r\n\r\n<figure class=\"wp-block-image size-large\"><a href=\"https:\/\/yunusozkorkmaz.files.wordpress.com\/2023\/11\/image-7.png\"><img decoding=\"async\" class=\"wp-image-461\" src=\"https:\/\/yunusozkorkmaz.files.wordpress.com\/2023\/11\/image-7.png?w=884\" alt=\"\" \/><\/a><\/figure>\r\n\r\n\r\n\r\n<figure class=\"wp-block-image size-large\"><a href=\"https:\/\/yunusozkorkmaz.files.wordpress.com\/2023\/11\/image-8.png\"><img decoding=\"async\" class=\"wp-image-462\" src=\"https:\/\/yunusozkorkmaz.files.wordpress.com\/2023\/11\/image-8.png?w=847\" alt=\"\" \/><\/a><\/figure>\r\n<p>\u00a0 Kind regards,<\/p>\r\n\r\n<p>&nbsp;<\/p>\r\n\r\n\r\n\r\n<p>&nbsp;<\/p>\r\n\r\n\r\n\r\n\r\n","protected":false},"excerpt":{"rendered":"<p>On this post, I am going to go over the &#8220;Formula&#8221; field within route functionality. Note: Master plan demonstration shown below is going to be originated from 400 meters of sales order quantity. Coverage group is &#8220;Requirement&#8221;. Sundays are closed for pick-up on the calenders assigned to machines. Resources have finite capacity and %100 efficiency. [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":916,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[92,102],"tags":[93,94,95,96],"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/myunusozkorkmaz.com.tr\/index.php?rest_route=\/wp\/v2\/posts\/915"}],"collection":[{"href":"https:\/\/myunusozkorkmaz.com.tr\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/myunusozkorkmaz.com.tr\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/myunusozkorkmaz.com.tr\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/myunusozkorkmaz.com.tr\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=915"}],"version-history":[{"count":7,"href":"https:\/\/myunusozkorkmaz.com.tr\/index.php?rest_route=\/wp\/v2\/posts\/915\/revisions"}],"predecessor-version":[{"id":933,"href":"https:\/\/myunusozkorkmaz.com.tr\/index.php?rest_route=\/wp\/v2\/posts\/915\/revisions\/933"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/myunusozkorkmaz.com.tr\/index.php?rest_route=\/wp\/v2\/media\/916"}],"wp:attachment":[{"href":"https:\/\/myunusozkorkmaz.com.tr\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=915"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/myunusozkorkmaz.com.tr\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=915"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/myunusozkorkmaz.com.tr\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=915"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}